Projects

BT Sheffield

The MEP design for the 7 storey office refurbishment successfully modernized the building infrastructure, improved energy efficiency, and provided flexibility for future office layouts. The integration of sustainable technologies ensured that the building met modern standards for comfort and environmental responsibility, positioning it as a model for future office refurbishments within the portfolio

Category: Office

Office space

Office space

The Brief

Primary Objectives 

  1. Upgrade existing CAT A landlord MEP systems and install CAT B to provide an efficient, sustainable, and comfortable environment.
  2. Implement energy-efficient systems that comply with local energy codes and reduce the building's carbon footprint.
  3. Design systems that allow for flexible office layouts, accommodating open-plan areas, private offices, and meeting rooms.
  4. Compliance, ensure all designs meet local building codes, health, and safety standards.

Our Approach

79group MEP designers worked closely with all key stakeholders to design efficient HVAC, lighting, electrical and public health services with sustainability in mind.  

Key activities included:

  • Ensuring MEP systems blended seamlessly with BTs interior design brief. 
  • Ensuring designs met all relevant codes and standards
  • Planning for the integration of smart lighting, HVAC, and security and control systems.

The Solution

The MEP design for the 7 floor office refurbishment successfully met with the client's brief of modernizing the existing services infrastructure and efficiency and provided flexibility for future office layouts. 

Scope of services included; 

HVAC -

  • utilised the existing VRF.
  • designed and installed new HVAC on lower ground floor.
  • Security grilles installed on ducting. 
  • Control System: Building Management System (BMS) for centralized control and monitoring

    2. Fire protection

3 -Electrical Systems

  • Power Distribution
  • System Design
  • Main Electrical Room
  • Sub-Metering
  • Backup Power: Diesel generator with automatic transfer switch for critical systems (IT, emergency lighting, elevators).
  • UPS system to back up the SER/MER rooms

4 - Lighting Design and install. 

  • LED Lighting: Energy-efficient LEDs with a focus on reducing glare and improving colour rendering.
  • Daylight Sensors: Automatically adjust lighting levels based on available natural light.
  • Occupancy Sensors: Reduce energy consumption in low-use areas like meeting rooms and restrooms.
  • Emergency Lighting: Battery-backed lights with clear exit signage

5 - Plumbing Systems

6 - Water Supply

7 - Drainage and Waste Management

Other Projects in Office

Discover how we can enlighten your environment.

We believe in the transformative power of brilliant environments, the increasing importance of sustainability and the critical role they both play in improving performance. Find out how we can transform your environment today.

Call us now on
01452 714391

Email your enquiry